Project-specific requirements
Start with the building type, operating hours, existing systems and the tasks the project needs to support. Drawings and an equipment inventory help identify the questions to resolve before selecting a design.
Fortega · Nova Scotia
Building automation systems coordinate selected building equipment, schedules and sensors. A smart-building project begins with an equipment inventory, supported interfaces and operating responsibilities. Security, HVAC and lighting integrations must be verified, and local control behaviour must be tested rather than assumed.
Start with the building type, operating hours, existing systems and the tasks the project needs to support. Drawings and an equipment inventory help identify the questions to resolve before selecting a design.
Nova Scotia's video-surveillance guidance is directed to public bodies and municipalities and discusses their privacy obligations. For a private business, establish the applicable privacy framework separately. A public-institution surveillance policy should not be adopted unchanged simply because the property is in the same province.
For building automation, inventory controllers, schedules, manual overrides and connected sensors. Establish the building owner's requirements and review any alterations to regulated systems separately; a public-building example is not proof of compatibility or energy savings.
Explore Nova ScotiaBuilding automation systems and smart building automation coordinate selected equipment, schedules and sensors. HVAC, lighting, security and building-management integrations depend on supported interfaces, operating permissions and commissioning; connecting devices alone does not guarantee savings or safe control.